---
title: FPV Construction Site Transformation — seedance-2.5 Prompt | RunAPI | RunAPI
description: Copy this RunAPI prompt, view agent setup steps, and use API code for seedance-2.5.
url: https://runapi.ai/prompts/prm_JRQ6zG9jy1eBUEbRyWBxbOra.md
canonical: https://runapi.ai/prompts/prm_JRQ6zG9jy1eBUEbRyWBxbOra
locale: en
site: RunAPI
image: https://runapi.ai/assets/opengraph-bfaaa0f0.png
prompt_id: 10068
model: seedance-2.5
modality: video
endpoint: "/api/v1/seedance/text_to_video"
---

> HTML version: https://runapi.ai/prompts/prm_JRQ6zG9jy1eBUEbRyWBxbOra
> Site index for agents: https://runapi.ai/llms.txt


# FPV Construction Site Transformation

Copy this RunAPI prompt, view agent setup steps, and use API code for seedance-2.5.

**Prompts** · Video

![FPV Construction Site Transformation preview](https://cdn.runapi.ai/public/prompts/previews/2a4b9c7bfb09ed84817f2eec5a36ae0ed805e813213bc81c025745b525dec791-runapi-ai.jpg)

## Prompt

```text
Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.

Photorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.

00:00–00:02- CORE ACTIVATION
Camera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.

00:02–00:04-CRANE CASCADE
Multiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.

00:04–00:06-STRUCTURE RISE
Hydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.

00:06–00:08- FLOOR RUSH
Camera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.

00:08–00:10- ROTATING FRAME
Camera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.

00:10–00:12- FACADE STORM
Hundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.

00:12–00:13.5- GLASS LOCK
Camera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.

00:13.5–00:15- FINAL MACHINE RELEASE
The final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city
```

<!-- prompt-detail-slot: generation-parameters -->
<!-- /prompt-detail-slot: generation-parameters -->

<!-- prompt-detail-slot: generate-cta -->

### Generate this prompt

| Model | Seedance 2.5 |
|---|---|
| Estimated cost | $0.14 / second |
| Endpoint | `/api/v1/seedance/text_to_video` |

[Sign in to generate](https://runapi.ai/login)

Your generated image will appear here
<!-- /prompt-detail-slot: generate-cta -->

<!-- prompt-detail-slot: prompt-breakdown -->

## Prompt Breakdown

### Subject

FPV Construction Site Transformation

### Atmosphere

architecture / Video

### Technical

seedance-2.5 / Seedance / Text To Video / /api/v1/seedance/text_to_video

### Style

aerial-reveal, construction-site, crane-cascade, glass-panel, mechanical, modern-building, photorealistic

<!-- /prompt-detail-slot: prompt-breakdown -->

<!-- prompt-detail-slot: supported-models -->
## Models That Support This Prompt

| Modality | Model | Price | Try |
|---|---|---|---|
| Video | HappyHorse/happyhorse-1.0-r2v | $0.18-$0.32 / second | [Try](https://runapi.ai/models/happyhorse/1.0-r2v.md) |
| Video | HappyHorse/happyhorse-1.0-t2v | $0.18-$0.32 / second | [Try](https://runapi.ai/models/happyhorse/1.0-t2v.md) |
| Video | HappyHorse/happyhorse-character | $0.24-$0.41 / second | [Try](https://runapi.ai/models/happyhorse/character.md) |
| Video | HappyHorse/happyhorse-text-to-video | $0.24-$0.41 / second | [Try](https://runapi.ai/models/happyhorse/text-to-video.md) |
| Video | Wan/wan-2.2-a14b-text-to-video-turbo | $0.30-$0.60 / video | [Try](https://runapi.ai/models/wan/2.2-a14b-text-to-video-turbo.md) |

<!-- /prompt-detail-slot: supported-models -->

## RUN DETAILS

| Field | Value |
|---|---|
| Model | `seedance-2.5` |
| Modality | Video |
| Category | architecture |
| Tags | aerial-reveal, construction-site, crane-cascade, glass-panel, mechanical, modern-building, photorealistic |

## Use with an agent

### Claude Code

1. claude mcp add runapi -s user -- npx -y @runapi.ai/mcp
2. Restart Claude Code
3. Paste this prompt: Generate a video: "Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.

Photorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.

00:00–00:02- CORE ACTIVATION
Camera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.

00:02–00:04-CRANE CASCADE
Multiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.

00:04–00:06-STRUCTURE RISE
Hydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.

00:06–00:08- FLOOR RUSH
Camera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.

00:08–00:10- ROTATING FRAME
Camera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.

00:10–00:12- FACADE STORM
Hundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.

00:12–00:13.5- GLASS LOCK
Camera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.

00:13.5–00:15- FINAL MACHINE RELEASE
The final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city"

### Codex

1. codex plugin install runapi-mcp@agents
2. Restart Codex
3. Paste this prompt: Generate a video: "Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.

Photorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.

00:00–00:02- CORE ACTIVATION
Camera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.

00:02–00:04-CRANE CASCADE
Multiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.

00:04–00:06-STRUCTURE RISE
Hydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.

00:06–00:08- FLOOR RUSH
Camera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.

00:08–00:10- ROTATING FRAME
Camera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.

00:10–00:12- FACADE STORM
Hundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.

00:12–00:13.5- GLASS LOCK
Camera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.

00:13.5–00:15- FINAL MACHINE RELEASE
The final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city"

### Cursor

1. npx @runapi.ai/mcp init cursor
2. Restart Cursor
3. Paste this prompt: Generate a video: "Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.

Photorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.

00:00–00:02- CORE ACTIVATION
Camera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.

00:02–00:04-CRANE CASCADE
Multiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.

00:04–00:06-STRUCTURE RISE
Hydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.

00:06–00:08- FLOOR RUSH
Camera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.

00:08–00:10- ROTATING FRAME
Camera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.

00:10–00:12- FACADE STORM
Hundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.

00:12–00:13.5- GLASS LOCK
Camera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.

00:13.5–00:15- FINAL MACHINE RELEASE
The final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city"

### Windsurf

1. npx @runapi.ai/mcp init windsurf
2. Restart Windsurf
3. Paste this prompt: Generate a video: "Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.

Photorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.

00:00–00:02- CORE ACTIVATION
Camera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.

00:02–00:04-CRANE CASCADE
Multiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.

00:04–00:06-STRUCTURE RISE
Hydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.

00:06–00:08- FLOOR RUSH
Camera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.

00:08–00:10- ROTATING FRAME
Camera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.

00:10–00:12- FACADE STORM
Hundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.

00:12–00:13.5- GLASS LOCK
Camera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.

00:13.5–00:15- FINAL MACHINE RELEASE
The final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city"

<!-- api-example-tabs-slot -->

<!-- ## API examples -->
## Generate via API

### curl

```curl
curl -X POST https://runapi.ai/api/v1/seedance/text_to_video \
  -H "Authorization: Bearer $RUNAPI_API_KEY" \
  -H "Content-Type: application/json" \
  --data-binary @- <<'JSON'
{
  "model": "seedance-2.5",
  "prompt": "Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.\n\nPhotorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.\n\n00:00–00:02- CORE ACTIVATION\nCamera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.\n\n00:02–00:04-CRANE CASCADE\nMultiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.\n\n00:04–00:06-STRUCTURE RISE\nHydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.\n\n00:06–00:08- FLOOR RUSH\nCamera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.\n\n00:08–00:10- ROTATING FRAME\nCamera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.\n\n00:10–00:12- FACADE STORM\nHundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.\n\n00:12–00:13.5- GLASS LOCK\nCamera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.\n\n00:13.5–00:15- FINAL MACHINE RELEASE\nThe final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city"
}
JSON
```

### Node.js

```javascript
import { SeedanceClient } from "@runapi.ai/seedance";

const client = new SeedanceClient({
  apiKey: process.env.RUNAPI_API_KEY,
});

const result = await client.textToVideo.run({
  "model": "seedance-2.5",
  "prompt": "Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.\n\nPhotorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.\n\n00:00–00:02- CORE ACTIVATION\nCamera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.\n\n00:02–00:04-CRANE CASCADE\nMultiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.\n\n00:04–00:06-STRUCTURE RISE\nHydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.\n\n00:06–00:08- FLOOR RUSH\nCamera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.\n\n00:08–00:10- ROTATING FRAME\nCamera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.\n\n00:10–00:12- FACADE STORM\nHundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.\n\n00:12–00:13.5- GLASS LOCK\nCamera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.\n\n00:13.5–00:15- FINAL MACHINE RELEASE\nThe final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city"
});
console.log(result.id);
```

### Python

```python
import json
import os
import requests

response = requests.post(
    "https://runapi.ai/api/v1/seedance/text_to_video",
    headers={"Authorization": f"Bearer {os.environ['RUNAPI_API_KEY']}"},
    json=json.loads("{\n  \"model\": \"seedance-2.5\",\n  \"prompt\": \"Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.\\n\\nPhotorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.\\n\\n00:00–00:02- CORE ACTIVATION\\nCamera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.\\n\\n00:02–00:04-CRANE CASCADE\\nMultiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.\\n\\n00:04–00:06-STRUCTURE RISE\\nHydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.\\n\\n00:06–00:08- FLOOR RUSH\\nCamera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.\\n\\n00:08–00:10- ROTATING FRAME\\nCamera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.\\n\\n00:10–00:12- FACADE STORM\\nHundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.\\n\\n00:12–00:13.5- GLASS LOCK\\nCamera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.\\n\\n00:13.5–00:15- FINAL MACHINE RELEASE\\nThe final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city\"\n}")
)
response.raise_for_status()
print(response.json()["id"])
```

### PHP

```php
<?php

$ch = curl_init("https://runapi.ai/api/v1/seedance/text_to_video");
curl_setopt_array($ch, [
    CURLOPT_POST => true,
    CURLOPT_HTTPHEADER => [
        "Authorization: Bearer " . getenv("RUNAPI_API_KEY"),
        "Content-Type: application/json",
    ],
    CURLOPT_POSTFIELDS => "{\n  \"model\": \"seedance-2.5\",\n  \"prompt\": \"Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.\\n\\nPhotorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.\\n\\n00:00–00:02- CORE ACTIVATION\\nCamera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.\\n\\n00:02–00:04-CRANE CASCADE\\nMultiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.\\n\\n00:04–00:06-STRUCTURE RISE\\nHydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.\\n\\n00:06–00:08- FLOOR RUSH\\nCamera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.\\n\\n00:08–00:10- ROTATING FRAME\\nCamera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.\\n\\n00:10–00:12- FACADE STORM\\nHundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.\\n\\n00:12–00:13.5- GLASS LOCK\\nCamera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.\\n\\n00:13.5–00:15- FINAL MACHINE RELEASE\\nThe final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city\"\n}",
    CURLOPT_RETURNTRANSFER => true,
]);

$response = json_decode(curl_exec($ch), true);
curl_close($ch);
echo $response["id"] . PHP_EOL;
```

### Java

```java
import java.net.URI;
import java.net.http.HttpClient;
import java.net.http.HttpRequest;
import java.net.http.HttpResponse;

var request = HttpRequest.newBuilder(URI.create("https://runapi.ai/api/v1/seedance/text_to_video"))
    .header("Authorization", "Bearer " + System.getenv("RUNAPI_API_KEY"))
    .header("Content-Type", "application/json")
    .POST(HttpRequest.BodyPublishers.ofString("{\n  \"model\": \"seedance-2.5\",\n  \"prompt\": \"Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.\\n\\nPhotorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.\\n\\n00:00–00:02- CORE ACTIVATION\\nCamera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.\\n\\n00:02–00:04-CRANE CASCADE\\nMultiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.\\n\\n00:04–00:06-STRUCTURE RISE\\nHydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.\\n\\n00:06–00:08- FLOOR RUSH\\nCamera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.\\n\\n00:08–00:10- ROTATING FRAME\\nCamera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.\\n\\n00:10–00:12- FACADE STORM\\nHundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.\\n\\n00:12–00:13.5- GLASS LOCK\\nCamera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.\\n\\n00:13.5–00:15- FINAL MACHINE RELEASE\\nThe final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city\"\n}"))
    .build();
var response = HttpClient.newHttpClient().send(request, HttpResponse.BodyHandlers.ofString());
System.out.println(response.body());
```

### Ruby

```ruby
require "json"
require "net/http"

uri = URI("https://runapi.ai/api/v1/seedance/text_to_video")
request = Net::HTTP::Post.new(uri)
request["Authorization"] = "Bearer " + ENV.fetch("RUNAPI_API_KEY")
request["Content-Type"] = "application/json"
request.body = "{\n  \"model\": \"seedance-2.5\",\n  \"prompt\": \"Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.\\n\\nPhotorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.\\n\\n00:00–00:02- CORE ACTIVATION\\nCamera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.\\n\\n00:02–00:04-CRANE CASCADE\\nMultiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.\\n\\n00:04–00:06-STRUCTURE RISE\\nHydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.\\n\\n00:06–00:08- FLOOR RUSH\\nCamera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.\\n\\n00:08–00:10- ROTATING FRAME\\nCamera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.\\n\\n00:10–00:12- FACADE STORM\\nHundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.\\n\\n00:12–00:13.5- GLASS LOCK\\nCamera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.\\n\\n00:13.5–00:15- FINAL MACHINE RELEASE\\nThe final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city\"\n}"

response = Net::HTTP.start(uri.hostname, uri.port, use_ssl: true) { |http| http.request(request) }
puts JSON.parse(response.body).fetch("id")
```

### Go

```go
package main

import (
  "context"
  "fmt"
  "log"
  "net/http"
  "os"
  "strings"
)

func main() {
  body := strings.NewReader("{\"model\":\"seedance-2.5\",\"prompt\":\"Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.\\n\\nPhotorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.\\n\\n00:00–00:02- CORE ACTIVATION\\nCamera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.\\n\\n00:02–00:04-CRANE CASCADE\\nMultiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.\\n\\n00:04–00:06-STRUCTURE RISE\\nHydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.\\n\\n00:06–00:08- FLOOR RUSH\\nCamera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.\\n\\n00:08–00:10- ROTATING FRAME\\nCamera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.\\n\\n00:10–00:12- FACADE STORM\\nHundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.\\n\\n00:12–00:13.5- GLASS LOCK\\nCamera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.\\n\\n00:13.5–00:15- FINAL MACHINE RELEASE\\nThe final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city\"}")
  req, err := http.NewRequestWithContext(context.Background(), http.MethodPost, "https://runapi.ai/api/v1/seedance/text_to_video", body)
  if err != nil {
    log.Fatal(err)
  }

  req.Header.Set("Authorization", "Bearer "+os.Getenv("RUNAPI_API_KEY"))
  req.Header.Set("Content-Type", "application/json")

  resp, err := http.DefaultClient.Do(req)
  if err != nil {
    log.Fatal(err)
  }
  defer resp.Body.Close()

  fmt.Println(resp.Status)
}
```

### CLI

```cli
$ runapi generate \
    --model seedance-2.5 \
    --prompt "Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.\n\nPhotorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.\n\n00:00–00:02- CORE ACTIVATION\nCamera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.\n\n00:02–00:04-CRANE CASCADE\nMultiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.\n\n00:04–00:06-STRUCTURE RISE\nHydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.\n\n00:06–00:08- FLOOR RUSH\nCamera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.\n\n00:08–00:10- ROTATING FRAME\nCamera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.\n\n00:10–00:12- FACADE STORM\nHundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.\n\n00:12–00:13.5- GLASS LOCK\nCamera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.\n\n00:13.5–00:15- FINAL MACHINE RELEASE\nThe final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city" \
    --wait
```

<!-- /api-example-tabs-slot -->

## More prompts like this

- [Continuous Time Journey Cinematic Video](https://runapi.ai/prompts/prm_vxONpLV7DlBquq5k4zd1mWMb.md) — `seedance-2.5`
- [Seedance prompt: animate](https://runapi.ai/prompts/prm_A7ZP1eWx4gRMiAw38l5VEQ6N.md) — `seedance-2.5`
- [Cyber-Noir Martial Arts Subway Fight](https://runapi.ai/prompts/prm_kArmQdxNymKYcl6w8lo5V3EW.md) — `seedance-2.5`

## Prompt questions

### Can I modify this prompt?

Yes. Use it as a starting point and adjust parameters, add details, or combine it with your own ideas.

### Which model should I choose?

Each model has different strengths. Compare the available models and choose the one that best matches the output you need.

### How much does it cost?

Pricing varies by model. See the estimated cost above the Generate button.

## Building with a team?

We're here to help with enterprise setup, integrations, and technical questions.

[Contact Us](https://runapi.ai/contact.md)


---

## More from RunAPI

- [Home](https://runapi.ai/.md)
### Product
- [Model Catalog](https://runapi.ai/models.md)
- [Pricing](https://runapi.ai/pricing.md)
- [Providers](https://runapi.ai/models#all-models)
- [Prompt Gallery](https://runapi.ai/prompts.md)
### Developers
- [Documentation](https://runapi.ai/docs/guides)
- [SDKs](https://runapi.ai/sdk.md)
- [CLI](https://runapi.ai/cli.md)
- [MCP Server](https://runapi.ai/mcp.md)
- [x402](https://runapi.ai/x402.md)
### Guides
- [Claude Code vs Cursor](https://runapi.ai/claude-code-vs-cursor.md)
- [Cursor API Setup](https://runapi.ai/cursor-api-setup.md)
- [RunAPI vs OpenRouter](https://runapi.ai/openrouter-alternative.md)
### Company
- [Enterprise](https://runapi.ai/contact.md)
- [Contact](https://runapi.ai/contact.md)
### Legal
- [Terms](https://runapi.ai/terms.md)
- [Privacy](https://runapi.ai/privacy.md)
- [Site index for agents](https://runapi.ai/llms.txt)

Contact: contact@runapi.ai

## Structured data

```json
[
  {
    "@context": "https://schema.org",
    "inLanguage": "en",
    "@type": "WebSite",
    "name": "RunAPI",
    "url": "https://runapi.ai/",
    "potentialAction": {
      "@type": "SearchAction",
      "target": {
        "@type": "EntryPoint",
        "urlTemplate": "https://runapi.ai/models?q={search_term_string}"
      },
      "query-input": "required name=search_term_string"
    }
  },
  {
    "@context": "https://schema.org",
    "inLanguage": "en",
    "@type": "Organization",
    "name": "RunAPI",
    "url": "https://runapi.ai/",
    "logo": {
      "@type": "ImageObject",
      "url": "https://runapi.ai/icon.svg"
    },
    "sameAs": [
      "https://github.com/runapi-ai"
    ]
  },
  {
    "@context": "https://schema.org",
    "inLanguage": "en",
    "@type": "BreadcrumbList",
    "itemListElement": [
      {
        "@type": "ListItem",
        "position": 1,
        "name": "Home",
        "item": "https://runapi.ai/"
      },
      {
        "@type": "ListItem",
        "position": 2,
        "name": "Prompts",
        "item": "https://runapi.ai/prompts"
      },
      {
        "@type": "ListItem",
        "position": 3,
        "name": "Video",
        "item": "https://runapi.ai/prompts/video"
      },
      {
        "@type": "ListItem",
        "position": 4,
        "name": "FPV Construction Site Transformation",
        "item": "https://runapi.ai/prompts/prm_JRQ6zG9jy1eBUEbRyWBxbOra"
      }
    ]
  },
  {
    "@context": "https://schema.org",
    "inLanguage": "en",
    "@type": "FAQPage",
    "mainEntity": [
      {
        "@type": "Question",
        "name": "Can I modify this prompt?",
        "acceptedAnswer": {
          "@type": "Answer",
          "text": "Yes. Use it as a starting point and adjust parameters, add details, or combine it with your own ideas."
        }
      },
      {
        "@type": "Question",
        "name": "Which model should I choose?",
        "acceptedAnswer": {
          "@type": "Answer",
          "text": "Each model has different strengths. Compare the available models and choose the one that best matches the output you need."
        }
      },
      {
        "@type": "Question",
        "name": "How much does it cost?",
        "acceptedAnswer": {
          "@type": "Answer",
          "text": "Pricing varies by model. See the estimated cost above the Generate button."
        }
      }
    ]
  },
  {
    "@context": "https://schema.org",
    "inLanguage": "en",
    "@type": "CreativeWork",
    "name": "FPV Construction Site Transformation",
    "text": "Create a 15-second ultra-dynamic continuous FPV construction transformation. Keep one identical modern building, one identical construction site, exact same architecture and final design throughout. The entire construction site behaves like one enormous synchronized MEGA MACHINE, where every movement mechanically activates the next.\n\nPhotorealistic Hollywood construction action, IMAX scale, 14mm extreme wide-angle, aggressive speed ramps, steel-blue shadows, warm construction-orange highlights, realistic dust, sparks, debris, motion blur and metallic reflections. One uninterrupted FPV shot, no cuts.\n\n00:00–00:02- CORE ACTIVATION\nCamera flies through the unfinished building toward a massive rotating mechanical construction core. Hydraulic arms suddenly extend and lock into the central structure. A powerful metal impact sends sparks across the lens, triggering the entire site.\n\n00:02–00:04-CRANE CASCADE\nMultiple tower cranes begin rotating in perfect synchronization. Their cables release enormous steel frames that swing through the air and lock precisely onto the building. Camera races between the moving structures with extreme near-misses.\n\n00:04–00:06-STRUCTURE RISE\nHydraulic construction platforms activate simultaneously. Columns extend upward while horizontal beams automatically slide into their connection points. Each lock triggers the next structural section, creating a rapid upward mechanical wave.\n\n00:06–00:08- FLOOR RUSH\nCamera dives through the building. Massive floor platforms travel along industrial rails from both sides, rapidly locking into place floor by floor. Mechanical clamps snap shut immediately behind the camera as the structure rises around it.\n\n00:08–00:10- ROTATING FRAME\nCamera bursts outside and performs a fast vertical orbit. Entire structural frames rotate upward from the ground like giant mechanical arms and lock into the building. The unfinished skeleton rapidly becomes the exact final silhouette.\n\n00:10–00:12- FACADE STORM\nHundreds of white curved façade sections and blue reflective glass panels launch from automated installation platforms. They fly toward the building in synchronized waves and snap perfectly into position around the curved exterior.\n\n00:12–00:13.5- GLASS LOCK\nCamera races along the façade as one enormous glass panel moves directly beside the lens. Speed suddenly drops into brief bullet time. Sparks and dust float almost motionless. The panel rotates and locks into its frame with a powerful mechanical impact.\n\n00:13.5–00:15- FINAL MACHINE RELEASE\nThe final impact activates every remaining construction mechanism at once. Rooftop elements, final glazing and architectural details rapidly lock into place. Camera shoots above the roof, performs a fast 180° rotation and pulls far backward into a monumental aerial reveal of the fully completed building above the city",
    "image": "https://cdn.runapi.ai/public/prompts/previews/2a4b9c7bfb09ed84817f2eec5a36ae0ed805e813213bc81c025745b525dec791-runapi-ai.jpg",
    "about": [
      "video",
      "seedance-2.5",
      "architecture"
    ]
  }
]
```
